Welcome to Tanglian Heavy Industry Group Co., Ltd.

Language

K/AE Type Glassl Lined Reactor

Glass-lined equipment is a kind of vessel whose main body is made of high quality carbon steel lined with special silicate glass by fritting as a high temperature nearly 800 degree centigrade. It has mechanical strength like steel-made vessel but better corrosion resistance. It is irreplaceable with stainless steel, engineering plastic and other alloy steel materials under a certain medium and temperature at corrosion resistance. It is also indispensable and economic corrosion resistance equipment for hydrolysis, neutralization, crystallization distillation evaporation and storage in industries of.

Please contact us

或者

E-mail us

Model No.

AE50/AE100/AE200/AE300/AE500/AE1000/AE1500/AE2000/AE3000/AE4000/AE5000/AE6300/AE8000/AE10000/AE12500

  • INNER VESSEL MATERIAL:Carbon Steel with Glass Linning
  • INNER VESSEL DESIGN PRESSURE:-0.1 / 0.6
  • INNER VESSEL DESIGN TEMPERATURE:-19 / 200
  • INNER VESSEL WORKING TEMPERATURE:-19 / 200
  • INNER VESSEL GLASS LINED THICKNESS:0.8-2.0
  • INNER VESSEL RESISTANCE TO SHARP TEMPERATURE VARIATION:COOL SHOCK 110,HOT SHOCK 120
  • JACKET MATERIAL:Carbon Steel
  • JACKET DESIGN PRESSURE:0 / 0.6
  • JACKET DESIGN TEMPERATURE:-19 / 200
  • JACKET WORKING TEMPERATURE:-19 / 200
  • JACKET GLASS LINED THICKNESS:0.8-2.0
  • JACKET RESISTANCE TO SHARP TEMPERATURE VARIATION:COOL SHOCK 110,HOT SHOCK 120
  • Glass-lined features:Resistant to chemical impact and corrosion of sulfuric acid, hydrochloric acid, nitric acid and various organic acids.
  • Glass-lined features:High temperature resistant enamel, glass-lined nozzle flange flanging.
  • Ingenuity spirit casting quality:Welding fine · Welding rigorous · Precise and meticulous Layers of quality inspection and security.
  • Products can be customized to meet customers’ needs in the aspects of structural design, function, capacity, and various working conditions ,etc.
  • A series of examinations will be taken before the final fabrication of the product are ready to put into batch production, inspection can be made any time before the final fabrication is ready.
  • We will provide instant service from the design drawings to after sales constantly upon the feedback from users.
  • The desgin department provide professional drawings for evaluating feasibility and practicability in the perspective of users.

Shandong Tanglian is located in Zibo, an important modern industrial city in China. It is a well-known chemical and pharmaceutical equipment manufacturer in northern China. The company has now developed into a whole industry chain integrating upstream chemical engineering design, equipment manufacturing and downstream installation and maintenance. The company has more than 20 years of experience in the production and design of chemical and pharmaceutical equipment, and has developed related process packages through continuous technical accumulation, providing process design and equipment manufacturing services for thousands of domestic and foreign companies. The advantage is obvious.

FAQs

Q1: Are you a factory or a trading company?

A1: Tanglian Heavy Industry Group Co., Ltd. is a comprehensive industrial and trade enterprise with 7 subsidiaries. It has the business ability of design, manufacture, trade integration, independent import and export.

Q2: Will there be any guarantee if I buy from you?

A2: We promise to provide a one-year warranty (from the date of delivery) for all products we currently sell. If a worn part is damaged during the warranty period (not due to mishandling), we will provide you with a new part free of charge.

Q3: Do you provide installation guidance or other after-sales service?

A3: Yes, of course. Installation drawings and installation manuals are provided. If you are still unable to assemble, we will arrange for our engineers to help you with voice or video contact.

Q4: What payment methods and terms do you accept?

A4: The payment methods we accept include: T/T, L/C, D/P; after signing the contract, the customer needs to pay 30% of the deposit first, and the remaining 70% of the payment will be completed in the payment.

Q5: What is your delivery time?

A5: We can arrange FOB, CIF shipping methods. Typically, the lead time for one device is 45 to 50 days, depending on the shipping method.

Q6: How do you pack and ship the equipment?

A6: We offer sea, rail or combined transportation. At the same time, we also provide LCL (LCL), Full Container (FCL), Flat Rack (FR), bulk and express to ensure the safety of the goods without damage.

  • We can provide you samples of glass-lined process samples, just pay the freight.